川消_萃聯(lián)
    氣體滅火系統(tǒng)
    自動(dòng)噴水滅火系統(tǒng)

    聯(lián)系我們

    • 萃聯(lián)(山東)消防設(shè)備有限責(zé)任公司
    • 電話:15508683119
    • 地址:山東省濟(jì)南市歷城區(qū)祝舜路44號(hào)
    當(dāng)前位置:首頁 > 新聞中心消防控制室內(nèi)消防設(shè)備管理規(guī)范

    消防控制室內(nèi)消防設(shè)備管理規(guī)范

    來源:http://www.xintli.net/ 日期:2023-09-20

    1.問題描述
    1. Problem Description
    消防控制室內(nèi)消防設(shè)備布置及安裝不符合規(guī)范要求。
    The layout and installation of fire equipment in the fire control room do not meet the requirements of the specifications.
    2.規(guī)范要求
    2. Specification requirements
    《火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范》(GB 50116-2013)有關(guān)規(guī)定:
    The relevant provisions of the Code for Design of Automatic Fire Alarm Systems (GB 50116-2013):
    3.4.8消防控制室內(nèi)設(shè)備的布置應(yīng)符合下列規(guī)定:
    3.4.8 The layout of equipment in the fire control room should comply with the following regulations:
    1設(shè)備面盤前的操作距離,單列布置時(shí)不應(yīng)小于1.5m;雙列布置時(shí)不應(yīng)小于2m。
    The operating distance in front of the equipment panel should not be less than 1.5m when arranged in a single row; When arranged in double rows, it should not be less than 2m.
    2在值班人員經(jīng)常工作的一面,設(shè)備面盤墻的距離不應(yīng)小于3m。
    On the side where the duty personnel frequently work, the distance between the equipment panel and the wall should not be less than 3m.
    3設(shè)備面盤后的維修距離不宜小于1m。
    The maintenance distance behind the 3 equipment panel should not be less than 1m.
    4設(shè)備面盤的排列長度大于4m時(shí),其兩端應(yīng)設(shè)置寬度不小于1m的通道。
    川消
    When the arrangement length of the 4 equipment panels is greater than 4m, channels with a width of no less than 1m should be set at both ends.
    5與建筑其他弱電系統(tǒng)合用的消防控制室內(nèi),消防設(shè)備應(yīng)集中設(shè)置,并應(yīng)與其他設(shè)備間有明顯間隔。
    5. In the fire control room that is used in conjunction with other weak current systems in the building, fire equipment should be centrally installed and clearly separated from other equipment.
    6.1.3火災(zāi)報(bào)警控制器和消防聯(lián)動(dòng)控制器安裝在墻上時(shí),其主顯示屏高度宜為1.5m~1.8m,其靠近門軸的側(cè)面距墻不應(yīng)小于0.5m,正面操作距離不應(yīng)小于1.2m。
    When installing the fire alarm controller and fire linkage controller on the wall, the height of the main display screen should be between 1.5m and 1.8m, and the distance from the side near the door axis to the wall should not be less than 0.5m, and the front operating distance should not be less than 1.2m.
    《火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收標(biāo)準(zhǔn)》(GB 50166-2019)有關(guān)規(guī)定:
    The relevant provisions of the "Construction and Acceptance Standards for Automatic Fire Alarm Systems" (GB 50166-2019):
    3.3.1火災(zāi)報(bào)警控制器、消防聯(lián)動(dòng)控制器、火災(zāi)顯示盤、控制中心監(jiān)控設(shè)備、家用火災(zāi)報(bào)警控制器、消防電話總機(jī)、可燃?xì)怏w報(bào)警控制器、電氣火災(zāi)監(jiān)控設(shè)備、防火門監(jiān)控器、消防設(shè)備電源監(jiān)控器、消防控制室圖形顯示裝置、傳輸設(shè)備、消防應(yīng)急廣播控制裝置等控制與顯示類設(shè)備的安裝應(yīng)符合下列規(guī)定:
    3.3.1 The installation of control and display equipment such as fire alarm controllers, fire linkage controllers, fire display panels, control center monitoring equipment, household fire alarm controllers, fire telephone exchanges, combustible gas alarm controllers, electrical fire monitoring equipment, fire door monitors, fire equipment power monitors, fire control room graphic display devices, transmission equipment, and fire emergency broadcast control devices should comply with the following regulations:
    1應(yīng)安裝牢固,不應(yīng)傾斜;
    1. It should be installed firmly and should not tilt;
    2安裝在輕質(zhì)墻上時(shí),應(yīng)采取加固措施;
    When installed on lightweight walls, reinforcement measures should be taken;
    3落地安裝時(shí),其底邊宜高出地(樓)面100mm~200mm。
    When installing on the ground, the bottom edge should be 100mm~200mm higher than the ground (floor) surface.
    應(yīng)對措施:
    Response measures:
    1)設(shè)計(jì)人員應(yīng)根據(jù)消防設(shè)備的布置規(guī)劃與建筑設(shè)計(jì)充分溝通,預(yù)留足夠的消防控制室面積;
    1) Designers should fully communicate with the architectural design profession based on the layout plan of fire equipment, and reserve sufficient fire control room area;
    2)應(yīng)根據(jù)選用的產(chǎn)品按相關(guān)規(guī)范標(biāo)準(zhǔn)進(jìn)行二次深化設(shè)計(jì),做出詳細(xì)、準(zhǔn)確的消防控制室設(shè)備布置大樣圖,施工單位應(yīng)嚴(yán)格按照設(shè)計(jì)圖紙及規(guī)范施工。
    2) The secondary deepening design should be carried out according to the selected products and relevant specifications and standards, and detailed and accurate equipment layout drawings for the fire control room should be made. The construction unit should strictly follow the design drawings and specifications for construction.
    感謝您的閱讀,此文的文章來源:川消更多的內(nèi)容和問題請點(diǎn) http://www.xintli.net 我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
    Thank you for reading. The source of this article is Chuanxiao. For more information and questions, please click http://www.xintli.net We will continue to work hard to provide you with services. Thank you for your support!
    上一篇:室內(nèi)消火栓設(shè)備包含哪些?
    下一篇:自裝卸式消防車的使用特點(diǎn)

    相關(guān)產(chǎn)品 / Related products

    国产区精品一区二区不卡中文| 无码精品日韩中文字幕| 日本免费中文视频| 成在人线av无码免费高潮水| 最近更新中文字幕在线| 毛片无码全部免费| 亚洲AV无码精品色午夜在线观看| 久久久噜噜噜久久中文福利| 91久久精品无码一区二区毛片| 国产成人无码av| 日本免费中文字幕| 无码精品A∨在线观看中文| 成人无码区在线观看| 亚洲AV永久纯肉无码精品动漫| 久久久中文字幕日本| 国产 日韩 中文字幕 制服| 精品人妻无码一区二区色欲产成人 | 九九久久精品无码专区| 亚洲AV无码码潮喷在线观看| 中文字幕久久精品| 日韩中文在线视频| 无码中文av有码中文a| 日韩专区无码人妻| 久久亚洲国产成人精品无码区 | 国模无码一区二区三区| 亚洲AV日韩AV高潮无码专区| 成人无码A区在线观看视频| 最近最新中文字幕视频| 中文字幕在线播放| 一二三四在线观看免费中文在线观看| 色欲狠狠躁天天躁无码中文字幕 | 亚洲av无码国产精品色在线看不卡| 精品人无码一区二区三区| 国产精品va无码一区二区| 久久久久亚洲av无码专区导航| 日韩av无码一区二区三区 | 国产日产欧洲无码视频无遮挡| 办公室丝袜激情无码播放| 91久久精品无码一区二区毛片| 久久亚洲精品无码播放| 日本阿v视频高清在线中文|