    當(dāng)前位置:首頁 > 新聞中心消防控制室內(nèi)消防設(shè)備的安裝標(biāo)準(zhǔn)規(guī)范

    消防控制室內(nèi)消防設(shè)備的安裝標(biāo)準(zhǔn)規(guī)范

    來源:http://www.xintli.net/ 日期:2024-02-27

    2.規(guī)范要求

    2. Normative requirements

    《火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范》(GB 50116-2013)有關(guān)規(guī)定:

    According to the relevant provisions of the Design Specification for Fire Automatic Alarm Systems (GB 50116-2013):

    3.4.8消防控制室內(nèi)設(shè)備的布置應(yīng)符合下列規(guī)定:

    3.4.8 The layout of equipment in the fire control room should comply with the following regulations:

    1設(shè)備面盤前的操作距離,單列布置時(shí)不應(yīng)小于1.5m;雙列布置時(shí)不應(yīng)小于2m。

    The operating distance in front of the equipment panel should not be less than 1.5m when arranged in a single row; When arranged in double rows, it should not be less than 2m.

    2在值班人員經(jīng)常工作的一面,設(shè)備面盤墻的距離不應(yīng)小于3m。

    On the side where the on duty personnel frequently work, the distance between the equipment panel and the wall should not be less than 3 meters.

    3設(shè)備面盤后的維修距離不宜小于1m。

    The maintenance distance after the 3 equipment panels should not be less than 1m.

    4設(shè)備面盤的排列長度大于4m時(shí),其兩端應(yīng)設(shè)置寬度不小于1m的通道。

    When the arrangement length of the 4 device face panels is greater than 4m, channels with a width of no less than 1m should be set at both ends.

    5與建筑其他弱電系統(tǒng)合用的消防控制室內(nèi),消防設(shè)備應(yīng)集中設(shè)置,并應(yīng)與其他設(shè)備間有明顯間隔。

    In the fire control room that shares with other weak current systems in the building, fire equipment should be centrally installed and there should be clear intervals between them and other equipment.

    6.1.3火災(zāi)報(bào)警控制器和消防聯(lián)動(dòng)控制器安裝在墻上時(shí),其主顯示屏高度宜為1.5m~1.8m,其靠近門軸的側(cè)面距墻不應(yīng)小于0.5m,正面操作距離不應(yīng)小于1.2m。

    When installing the fire alarm controller and fire linkage controller on the wall, the height of the main display screen should be between 1.5m and 1.8m. The side near the door axis should not be less than 0.5m away from the wall, and the front operating distance should not be less than 1.2m.

    20230401103726474.png

    《火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收標(biāo)準(zhǔn)》(GB 50166-2019)有關(guān)規(guī)定:

    According to the relevant provisions of the Construction and Acceptance Standards for Fire Automatic Alarm Systems (GB 50166-2019):

    3.3.1火災(zāi)報(bào)警控制器、消防聯(lián)動(dòng)控制器、火災(zāi)顯示盤、控制中心監(jiān)控設(shè)備、家用火災(zāi)報(bào)警控制器、消防電話總機(jī)、可燃?xì)怏w報(bào)警控制器、電氣火災(zāi)監(jiān)控設(shè)備、防火門監(jiān)控器、消防設(shè)備電源監(jiān)控器、消防控制室圖形顯示裝置、傳輸設(shè)備、消防應(yīng)急廣播控制裝置等控制與顯示類設(shè)備的安裝應(yīng)符合下列規(guī)定:

    3.3.1 The installation of control and display equipment such as fire alarm controllers, fire linkage controllers, fire display panels, control center monitoring equipment, household fire alarm controllers, fire telephone exchanges, combustible gas alarm controllers, electrical fire monitoring equipment, fire door monitors, fire equipment power monitors, fire control room graphic display devices, transmission equipment, fire emergency broadcast control devices, etc. shall comply with the following regulations:

    1應(yīng)安裝牢固,不應(yīng)傾斜;

    1. It should be installed firmly and not tilted;

    2安裝在輕質(zhì)墻上時(shí),應(yīng)采取加固措施;

    When installed on lightweight walls, reinforcement measures should be taken;

    3落地安裝時(shí),其底邊宜高出地(樓)面100mm~200mm。

    When installing on the ground, the bottom edge should be 100mm to 200mm higher than the ground (floor).

    應(yīng)對措施:

    Response measures:

    1)設(shè)計(jì)人員應(yīng)根據(jù)消防設(shè)備的布置規(guī)劃與建筑設(shè)計(jì)充分溝通,預(yù)留足夠的消防控制室面積;

    1) Designers should fully communicate with the architectural design profession based on the layout plan of fire equipment, and reserve sufficient area for fire control rooms;

    2)應(yīng)根據(jù)選用的產(chǎn)品按相關(guān)規(guī)范標(biāo)準(zhǔn)進(jìn)行二次深化設(shè)計(jì),做出詳細(xì)、準(zhǔn)確的消防控制室設(shè)備布置大樣圖,施工單位應(yīng)嚴(yán)格按照設(shè)計(jì)圖紙及規(guī)范施工。

    2) Secondary deepening design should be carried out according to relevant specifications and standards based on the selected products, and detailed and accurate layout drawings of fire control room equipment should be made. The construction unit should strictly follow the design drawings and specifications for construction.

    上一篇:超細(xì)干粉自動(dòng)滅火裝置的使用介紹
    下一篇:消防設(shè)備需要多久維修保養(yǎng)一次?

    相關(guān)產(chǎn)品 / Related products

    毛片一区二区三区无码| 在线欧美中文字幕农村电影| 色欲香天天综合网无码| 无码夫の前で人妻を犯す中字| 88久久精品无码一区二区毛片| 一区二区三区在线观看中文字幕| 无码人妻精品一区二区蜜桃百度| 中出人妻中文字幕无码| 日韩中文字幕在线视频| 无码精品第一页| 国产乱人无码伦av在线a| 亚洲精品无码久久久久sm| 在线中文字幕av| 中文字幕人妻丝袜乱一区三区| 国产50部艳色禁片无码| 亚洲va无码手机在线电影| 精品久久久无码中文字幕| 中文字幕久久波多野结衣av| 精品久久久无码中文字幕天天| 免费无遮挡无码永久视频| 亚洲国产精品无码久久98| 毛片免费全部播放无码| 欧美日韩不卡一区二区三区中文字 | 天堂在线观看中文字幕| 中文字幕久久波多野结衣av| 无码任你躁久久久久久 | 亚洲一本大道无码av天堂| 97无码免费人妻超| 波多野结AV衣东京热无码专区| 日韩精品久久无码中文字幕| 亚洲AV无码久久精品蜜桃| 亚洲色偷拍另类无码专区| 国产aⅴ激情无码久久| 精品日韩亚洲AV无码一区二区三区| 炫硕日本一区二区三区综合区在线中文字幕 | 中文在线中文A| 一本之道高清无码视频| 自拍中文精品无码| 欧美 亚洲 日韩 中文2019| 久久无码中文字幕东京热| 中文字幕在线亚洲精品|